Flat Rate Math

What to charge to replace meter base (utility coordination excluded)

This is panel and service work, the highest-stakes tickets in the book, where coordination and code drive the price. Figure about 4 hours on a Normal run, with roughly $220 of material at contractor cost before markup. At a $120/hour shop rate - the worked example we use across this site - the flat-rate math for "replace meter base (utility coordination excluded)" comes out like this:

Easyeverything cooperates: good access, sound wiring, no surprises$660
Normalthe typical version of this job in an occupied home$755
Hardpoor access, aged or altered wiring, extra protection or staging$925
Easy $660Normal $755Hard $925

Same math: hours x grade x your rate, plus material at 25% markup, rounded up to $5. Don't know your rate? Find it free in two minutes.

What makes this job Easy or Hard

Panel work grades on scope creep you can see coming. Easy is a healthy panel with space, copper feeders and a straightforward task like landing one breaker. Normal covers most replacements and corrections in sound equipment. Hard is where the real jobs live: full upgrades with utility coordination, mast and meter work, grounding electrode upgrades to current code, crowded or rusted enclosures, aluminum feeder terminations, and every circuit in the house getting re-landed and labeled. A 100-to-200 amp upgrade is a full day-plus with permits, inspection and a planned outage - price it like the project it is, not like a big breaker swap. Older panels bring brand-specific surprises; some are replace-on-sight. Anything involving the service entrance also involves the utility and the inspector, and their schedules are part of your cost. Never grade panel work down to win a bid; it is the one category where surprises are guaranteed.

Don't forget

Permit territory: this category often requires a permit and inspection. Price the permit as its own line and count the scheduling time as real labor.

Permits and inspection are their own line - $150-400 in most jurisdictions plus your time to pull and meet. Utility coordination on service work is billable scheduling, not a favor.

Questions

Why is there a price range instead of one number?
Panel condition, code-required upgrades and utility coordination move these jobs between grades. The same nominal task in a clean modern panel and in a rusted, double-tapped one are very different days.

Do these prices include the permit?
No - permits and inspection fees vary by jurisdiction ($150-400 is common) and belong on their own line, plus the time to pull the permit and meet the inspector.

Related panels & service prices